Battery Supply Chain > Battery Cell Factories > A123 Systems (MI)
A123 Systems (MI)
[Last updated: Jan 2026]
This EV battery pack factory is part of the advanced manufacturing and industrial electrification ecosystem in MI state.
Factory: A123 SystemsAlt name: Plants 1, 2
Main product: Battery cells
Other product: Other cells
Chemistry: LFP
Output: 1 GWh/yr
Address:
27101 Cabaret Drive
Novi, MI 48377
Phone: 248-412-9100
Employees:
EV battery cell gigafactories are large-scale industrial production facilities that include cell manufacturing, automation, and high-throughput logistics. These facilities impose significant electrical load, thermal management, and site electrification requirements, and serve as anchor nodes within regional supply chains and energy infrastructure.
