Battery Supply Chain > Battery Cell Factories > A123 Systems (MI)


A123 Systems (MI)


[Last updated: Jan 2026]

This EV battery pack factory is part of the advanced manufacturing and industrial electrification ecosystem in MI state.

Factory: A123 Systems
Alt name: Plants 1, 2
Main product: Battery cells
Other product: Other cells
Chemistry: LFP
Output: 1 GWh/yr

Address:
27101 Cabaret Drive
Novi, MI 48377

Phone: 248-412-9100
Employees:


EV battery cell gigafactories are large-scale industrial production facilities that include cell manufacturing, automation, and high-throughput logistics. These facilities impose significant electrical load, thermal management, and site electrification requirements, and serve as anchor nodes within regional supply chains and energy infrastructure.


Related supply chain and infrastructure